This is an old revision of the document!
Software Development Meeting 2010-May-26
Suggested Actions
- Audiological Information
- Add frequency specific UCL measures.
- Calculate PTA (pure tone thresh avg) 2 and 3 freq.
- Data set for Real ear measurements, currently align with.
- Fitting:
- Add binaural support for fitting controls.
- Red/blue controls deactivate if connection with hearing aid is lost.
- Add “check alive connection” support.
- Verification button
- Options for different In Situ methods.
- Review Resound for the present tone sweep.
- Directional support: find a location. Polar plot displayed over current chart.
- Graph: easy mouse navigation in controls, and results reflected real-time on graph.
- Scrolling through drop down boxes and have it change as you go.
- Drag and drop support for certain functions.
- Copy one side to other.
- Copy one memory to other.
- Prescription.
- Clarujust access.
- Not only link sides but also linking the memories to change a parameter such as gain
- Products:
- Hover over with mouse enable full list for drop downs
- Filter by:
- Technology
- Style
- Reports
- Session report
- Mailing/mktg report
- Profile report
- Sound library to play sound files.
- Support & Training:
- Tutorial button
- Video
- Delivery list to check off to print and have provider and pt sign for documentation
- Mandate so that patient, products, fitting and reports always shows.
- Graphs:
- HL/SPL selections
- SSPL90
- Scrolling over with updates instantly graphed to show how it could be
- Hover and scroll on EQs not just select the box to be able to scroll ( you can double click and roll)
- Graphical representations:
- RESR doesn’t need to be there, 2cc ospl 90
- Otherwise I/O curves, gain, etc. as demo’d on the NAL-NL1 Clinician software
Completed Actions
- Audiological Information:
- Speech Test: Clarujust summary data. — Siegwart Mayr 2010/05/27 14:32
- Impedance: Tympanometry with tympanogram (provided by Barbara). — Siegwart Mayr 2010/06/10 09:46
- Fitting:
- Patient Info: Acclimatization levels + Pre-fitting info. — Siegwart Mayr 2010/06/10 09:47
Conclusion
Next Steps:
- Review this list and then review again in 2 weeks.
- Build consensus on layout and functionality.
- Meet regularly every 2 weeks, Mondays at 2 pm.
- Next schedule meeting: Jun 07, 2010.