NAL autofit in process.
VC analog and digital available will need to be specified at time of order.
Solution guide in process.
Corfigs for styles.
Figures (like corfigs) for the open dome vs. power dome vs. closed dome for slim tubes. Ideally take into account vent size as well.
iSceneDetect will be on a tab as on/off option.
Time constants?
Programming speed: still of concern.
BTE/open housing for Intellio.
Wire up Flx case for Intellio as soon as sound design boards come in (est. Dec 14, 2009).
Physical sample Intellio flx.
Software BTE targets.
Software ready for testing and limited trials within 2 weeks (Dec 14, 2009).
January 2010 anticipated release.
Meetings on Monday afternoons following Joel’s lunch (2:30pm) in conference room for updates.